Services: Recent Water Remediation Projects Erie County , OH Ruptured water sprinkler line in ceiling flooded 10,000 sq ft facility. Building was new and had not been occupied yet. Timely and carefully orchestrated action by RestorePro structural drying technicians enabled the facility to be completely dried in only three days. The dry-down was achieved using the Vortex (top-down) drying method, a trailer mounted desiccant dehumidifier, and the InjectiDry systems saving all the carpets and walls. Minor cosmetic restoration to commercial wallpaper and base molding was all that was needed for complete return to pre-loss. They moved in only a few days later than was originally scheduled. Single
Family Residence - 3500sq ft - $5,900 Broken washer hose flooded 2000sf of walls and floor. Utilizing the Vortex drying methods, the hardwood floor, carpets, and furniture/contents were successfully dried in 72 hours. No removal of walls or flooring was required. Moisture test probes showed less than 1% moisture levels in hardwood floor after dry-down. Acceptable level of moisture, according to the IICRC manual for hardwood floors, is 12%. Homeowner was back to normal in less than one week. Single
Family Residence - 1900sq ft - $3,600 Torrential rain and wind blew the temporary roof off, causing flooding of the fully finished basement (where the family was living during construction of the upper level). Ceilings, walls, floors and personal contents were completely saturated. Once again top down drying methods were employed (VORTEX drying), saving all contents, walls and floors. The suspended ceiling panels were the only materials that had to be replaced. Drying of structure AND all contents was complete in less than 72 hours. Condominium
3 units - 6000sq ft - $29,100 Sewage backflow required the removal of carpet and 24” of drywall. Full antimicrobial cleaning of floors and wall studs was completed in accordance with IICRC standards. HVAC duct system was also contaminated and required thorough cleaning and disinfecting. Reconstruction, including replacing hardwood floors, carpet, drywall, wallpaper and oak trim was completed in less than 14 days. Only one condo owner was displaced for one week. Medical Office
- $13,700 As a result of freezing during a power outage, a broken toilet and water line caused damage to part of a second floor and the doctors offices below. Removal of all damaged structure materials was achieved in less than 24 hours and reconstruction was completed within 11 days. Water